[geeklog-devel] Geeklog 1.9.0 RC Timeline

Tom websitemaster at cogeco.net
Thu Feb 9 14:50:08 EST 2012


Hey Vinny,

 

I just did a general test of things and didn't run into any problems. It
installed and upgraded fine in mysql.

 

The configuration, user admin editor, and my account (editing passwords,
deleting accounts) all seem to work fine and save the password as set in the
config.

 

I'll setup oauth and openid and try that next.

 

Tom

 

From: geeklog-devel-bounces at lists.geeklog.net
[mailto:geeklog-devel-bounces at lists.geeklog.net] On Behalf Of Vincent Furia
Sent: February-09-12 12:17 AM
To: Geeklog Development
Subject: Re: [geeklog-devel] Geeklog 1.9.0 RC Timeline

 

I just pushed a new branch to the Geeklog Mercurial repository called
"password_update". There are a few bug fixes since I posted the patch here,
so the Mercurial version is preferred for testing. The branch is synced with
HEAD (as of now), so should work for integration testing as well.

My plan is to continue testing from the "password_update" branch. Once
everyone is satisfied with it, I'll merge it into HEAD. Hopefully, this
sounds like reasonable method for adding this (pretty significant) feature.

-Vinny

On Wed, Feb 8, 2012 at 12:59, Tom <websitemaster at cogeco.net> wrote:

So are we still on track for and end of February release?

 

Dirk do you think you have time to have the first 3 items on the list since
you have the most experience with the install and have already dealt with
the comment form?

 

I am not sure what is involved but I will take a look at Support IPv6 in
Spam-X IP Blacklist module.

 

I do not think we should update Geeklog.net with this release.  I rather
have some more testing done before that happens.  I also believe I need to
do a few forum updates to make it compatible with Geeklog 1.9.0 (I will have
to check on that).

 

Tom

 

 

From: geeklog-devel-bounces at lists.geeklog.net
[mailto:geeklog-devel-bounces at lists.geeklog.net] On Behalf Of Tom
Sent: January-22-12 10:01 AM
To: 'Geeklog Development'
Subject: [geeklog-devel] Geeklog 1.9.0 RC Timeline

 

Hey,

 

I was just wondering about the time frame for getting Geeklog 1.9.0 RC out
the door? There is a lot of stuff that needs to be tested.

 

Stuff left to do that should be added or fixed that I see include: 

 

-          Mercurial Install Error

-          Failure when trying to report sitemap.xml write error

-          Comments Form

-          Delete OAuth Account bug

-          Support IPv6 in Spam-X IP Blacklist module

-          Scripts class including theme's style.css

-          Password Hash Upgrade

 

 

Anything else or any comments?

 

Tom


_______________________________________________
geeklog-devel mailing list
geeklog-devel at lists.geeklog.net
http://eight.pairlist.net/mailman/listinfo/geeklog-devel

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist8.pair.net/pipermail/geeklog-devel/attachments/20120209/f15fa0ae/attachment.html>


More information about the geeklog-devel mailing list